Skip to content
Advanced course · 9 min

Planting and crop management for coffee

Decide whether to stump an old coffee plot or replant it with a resistant variety, see what has to happen before anyone cuts, and plan the renewal from the harvest record to the first check after planting.

The whole course in one video
  1. 1

    Pick the plot first

    Open a new chat and tap Plots (All) under the question box. Choose the plot you want advice for. ORTH then works from that plot’s crop, variety, soil and documents, and from the farm weather.

    For coffee Pick one plot of one variety. We picked Lote 2: Caturra, a variety that is susceptible to leaf rust, 0.99 ha with 4,500 trees planted in October 2016, under guamo shade, rain-fed, on volcanic ash soil at about 1,450 m. The main harvest is under way. Every number below is for that plot.

  2. 2

    Start from the Crop Selection button

    Tap Crop Selection for questions such as a planting and harvest calendar, varieties for your market and harvest window, or crops that fit a plot’s soil, water and climate. For pruning and fruit set, type your question.

    For coffee The suggestions include a planting calendar and varieties for your market. For a renewal decision we typed our own question.

  3. 3

    Ask: stump or replant

    We told ORTH that Lote 2 is Caturra from 2016, that yields fell over the last two harvests, that leaf rust keeps coming back and that we are containing a root-rot patch. ORTH’s call: do not stump the whole plot and carry the same Caturra into another cycle. Stumping, zoca, renews the canopy but keeps two problems, a rust-susceptible variety and the old roots. Replanting means a longer gap without harvest, but it changes the variety and lets you rebuild the stand. ORTH would replant the healthy area with a rust-resistant variety, in stages if money or labour are short, and keep zoca only for clearly healthy rows outside the patch.

  4. 4

    See what comes before the cut

    ORTH gave no permission to cut yet and set the order. First the harvest: finish it and rebuild the totals of the last two harvests, because the farm has no plot-level yield records and the comparison cannot be made without them. Then the root-rot patch as a separate job, on workable soil. Then a soil sample of Lote 2 itself, keeping the healthy area apart from the patch, because Lote 1’s report says nothing about Lote 2. Then the variety, the nursery, the layout and the shade plan, all approved before anyone cuts. ORTH’s words: do not remove the stand and then start deciding what will replace it.

  5. 5

    Choose the plants and the place

    For the new trees ORTH asks for certified, traceable planting material of a rust-resistant variety, chosen for how it adapts locally, how it grows under guamo shade, its plant shape, cup quality and what your Colombian and European buyers accept. A buyer premium for Caturra could justify keeping a small healthy section, not the whole plot. The shade and layout plan maps the guamo trees you keep, the planting pattern and the access, and leaves the root-rot footprint unplanted until sanitation is finished, the edge is stable and an experienced coffee agronomist clears it.

  6. 6

    Save the proposal as actions

    When ORTH proposes a plan, tap Review to see every action with its date, category and instructions. Change or add actions if you need to, then tap Create. The actions land in the plot’s plans, ready to assign to someone on your team.

    For coffee We asked for the renewal as a plan, with the right time of year to cut and plant. ORTH proposed 16 actions from 18 November to 5 April: the harvest register and the last two harvests, the soil sampling design and the sample, a shortlist of rust-resistant varieties, nursery checks and the supplier, the soil result and a root-zone clearance, the shade map and the layout, a go or no-go decision on 12 February, cutting on 16 February, shade adjustment and planting holes, a go or no-go decision on 15 March, planting on 22 March and a survival check on 5 April. Each cut or planting goes ahead only if its checks pass. We saved it with Create.

  7. 7

    Ask what changes on a resistant plot

    We asked whether the answer would be different for Lote 1, the Castillo from 2021, once its yields fall. ORTH said yes: stumping makes more sense there, because Castillo already resists rust and a healthy root system brings the canopy back sooner than replanting. But a falling yield alone is not the trigger: it wants the harvest history, a count of healthy trees and gaps, and a look at the roots and collars first. On a Robusta farm, old stems are usually replaced in rotation while younger ones keep producing, rather than copying a stumping recipe from Arabica.

Tip. Record each plot’s harvest separately. A renewal decision rests on the yield history, and ORTH can only compare options it can measure.

Check yourself

1. What does stumping keep on an old Caturra plot?

2. What comes before cutting the stand?

3. When is the root-rot footprint planted again?

4. Why could stumping suit Lote 1 later?

Sources: Cenicafé: renovación de cafetales por zoca

More courses for coffee

Planting and crop management

Meet ORTH at DATAGRI 2026 · Valladolid, 18–19 Nov · 10% off ORTH Teams & EnterpriseClaim your 10%