Skip to content
Advanced course · 9 min

Planting and crop management for soybean

Count a patchy soybean stand with ORTH, see why it replants only the failed zone and only when the clay can carry the planter, and plan the nodule check that follows.

The whole course in one video
  1. 1

    Pick the plot first

    Open a new chat and tap Plots (All) under the question box. Choose the plot you want advice for. ORTH then works from that plot’s crop, variety, soil and documents, and from the farm weather.

    For soybean Pick one plot of one variety; the stand count sheet for Talhão 2, an example PDF, was attached in the chat. We picked Talhão 2: non-Bt soybean, maturity group 6.3, 25.1 ha, sown on 30 October 2026 after wheat, no-till and rainfed, now at V1 to V2. Every answer below is for that plot.

  2. 2

    Start from the Crop Selection button

    Tap Crop Selection for questions such as a planting and harvest calendar, varieties for your market and harvest window, or crops that fit a plot’s soil, water and climate. For pruning and fruit set, type your question.

    For soybean The suggestions are about calendars, varieties and crop risks. Our question was about the plants already in the ground, so we attached the stand count and typed it, and ORTH added the sheet to the Talhão 2 documents.

  3. 3

    Give ORTH the stand count

    ORTH said: do not replant the whole talhão. We told it Talhão 2 was sown on 30 October at 14 seeds per metre in 50 cm rows, aiming at 12 plants per metre, with 85 % germination on the bag, and that heavy rain two days later left water standing in the low eastern third. From the 12 counting points, ORTH worked out 10.81 plants per metre in the west and centre, 216,250 plants per hectare, about 90 % of the target, and 3.75 in the east, 75,000 per hectare, about 31 %. The whole-field mean of about 169,000 is misleading.

  4. 4

    Replant only the failed zone

    ORTH’s decision: keep the west and centre two thirds and replant the failed parts of the eastern low zone, probably most of its 8 ha. Soybean compensates by branching where the stand is near target, but not at 31 %. At 19 days and V1 to V2, little more will emerge. The contrast between west and east points to waterlogging, crusting and seed rot, not the seed lot or the inoculation. Flag the boundary with extra counts, treat whole failed strips as replant blocks, and use fresh seed, fresh inoculant and a similar maturity.

  5. 5

    Decide now, sow when the soil allows

    ORTH said to decide no later than 20 November and sow at the first window when the clay can carry the planter. Rain is forecast through 25 November, with 53 mm that day, so 26 or 27 November may be the first window. Never force the planter through saturated clay, and check that the later date stays inside the ZARC, insurance and seed company windows.

  6. 6

    Save the proposal as actions

    When ORTH proposes a plan, tap Review to see every action with its date, category and instructions. Change or add actions if you need to, then tap Create. The actions land in the plot’s plans, ready to assign to someone on your team.

    For soybean ORTH proposed 11 actions, each with a date, a role and a check, and no products or doses. They run from 19 November to 16 December 2026: mapping and staking the low zone, a paired inspection of the cause, the replant decision on 20 November, marking the blocks, a trafficability check after the rain, the partial replant only if the soil passes, the nodule check at V3 to V4, what to do if nodules are few, and a close-out review. We saved it with Create.

  7. 7

    Ask what changes on other farms

    ORTH said that on Talhão 1 the establishment plan becomes a monitoring plan for the reproductive stages, with no replant, because pods are already set. Map edges, interior and refuge apart, and do not let the refuge’s higher caterpillar count stand for the Bt area. In Mato Grosso, rebuild the dates from the municipality, the sowing date and the stage, and keep a replant deadline only while the crop is young enough. In common bean, stand uniformity weighs more, nodules are checked with the bean’s own rhizobia, and poor fixation may need its own nitrogen strategy.

Tip. Count by zone, not one average for the field. ORTH then separates a failed strip from a stand that can still compensate.

Check yourself

1. West 216,250 plants per hectare, east 75,000. Why not use the field mean?

2. What does ORTH replant?

3. The decision is due on 20 November, but the clay is saturated. What then?

4. On Talhão 1, with pods already set, what does the plan become?

Sources: Embrapa Soja (2020): Tecnologias de produção de soja, cap. 4, instalação da lavoura · Embrapa Soja (2020): Tecnologias de produção de soja, cap. 8, fixação biológica de nitrogênio

More courses for soybean

Planting and crop management

Meet ORTH at DATAGRI 2026 · Valladolid, 18–19 Nov · 10% off ORTH Teams & EnterpriseClaim your 10%